The plant and machinery incorporating the latest technology in grinding and classification is of German origin. It is also equipped with computerized Central Control Panels allowing automatic and manual operations. THE FIRST PHASE of the plant with a nominal installed capacity of 25,000 MT per annum was commissioned in May 2002. THE SECOND PHASE of the plant with a nominal capacity of 75,000 MT per annum was commissioned in October 2007. The second phase of the plant consists of a grinding plant, a coating plant and a powder classifying plant.
يتم التحقق من جميع الشركات يدوياً للتأكد من أصالتها ومصداقيتها.
دعم كامل للغتين للمستخدمين المحليين والدوليين.
بياناتك ومعاملاتك محمية بأمان على مستوى المؤسسات.
فريق دعم عملاء متخصص متاح على مدار 24 ساعة.
Search by category, city, rating and price range
Seamless experience across all devices
Track your views and inquiries in real time
Rate and review businesses transparently